1. The wildcat technology standard that artesian well contractor establishes according to Party A, be in charge of removing from well site preparation, borer, get into reach… 钻井承包商根据甲方制定的油井技术标准,负责从井场预备、钻机搬迁、钻进及完…
2. In addition, the stability of wildcat well is generally determined by experience, so the disaster at complex formations is unable to avoid. 此外,野猫井的井壁稳定性一般凭经验判断,所以复杂地层的井壁失稳事故在所难免。
3. Nowadays, at home and abroad, there are few reports about how to predict rock drillability of wildcat well before drilling in new exploration area. 目前,国内外关于新探区野猫井的岩石可钻性钻前预测方面的研究很少。
4. Because there is a few wildcat well and data is lacking in the say, the isopleth maps of the variable physical parameters can be obtained only using kriging. 乌尔逊凹陷探井少,资料缺乏,克里金法的应用为研究获取了比较符合实际的各类物性参数等值线图。
5. Nowadays, at home and abroad, there are few reports about how to predict rock drillability of wildcat well before drilling in new exploration area. 目前,国内外关于新探区野猫井的岩石可钻性钻前预测方面的研究很少。