同义词
参考例句
1. Aiming at the optimizing problem of
minelaying plans, a new evaluation method is proposed.
针对布雷作战方案优选问题,提出了一种新的评估方法。
英英解释
n.
1. laying explosive mines in concealed places to destroy enemy personnel and equipment
网络释义
Copyright @ 2005-2013 可可英语 京ICP备11028623号