1. At present, the experience method of installing the camber has many problems. 经验法设置大跨径连续刚构桥预拱度存在诸多问题。
2. Starting with airfoil 2, the pitching moment is increased from -. 15 to -. 25 to provide more aft loading and aft camber. 从翼型2俯仰时刻由原来的15年至今25年至今,以提供更多后部后部拱落。
3. The model showed that the factors affecting the caster measuring precision are the kingpin inclination, the camber, and the turntable angle. 根据该模型得出影响主销后倾测量精度的因素为主销内倾、车轮外倾及转角盘转角。
英英解释
n.
1. a slight convexity (as of the surface of a road)
2. a slope in the turn of a road or track; the outside is higher than the inside in order to reduce the
3. the alignment of the wheels of a motor vehicle closer together at the bottom than at the top v.
1. curve upward in the middle