可可英语 | 听写训练 | 情景会话 | 擂台赛 | 每日英语 | 口语秀 | 写作 | 可可地盘 | 可可论坛 | 意见建议 | 登录

词典 | 翻译 | 生词本 | 背单词 | 可可首页

参考例句

    1. The duty of the post-contract is obviously quite different from the contract given duty, the contract assumpsit duty and the pre-contract duty.
    后合同义务与合同给付义务、约定义务、先合同义务有着显著的不同。
    2. The first round manage contract the contract carries out a circumstance (one) finished in the round manage contract the each index task in the contract.
    第一轮经营承包合同执行情况 (一)全面完成了经营承包合同中的各项指标任务。
    3. Macao Traffic Management Bureau announced that connect the peninsula Ka Lok Bailey Bridge, Friendship Bridge, West Bay Bridge and the Lotus Bridge linking Zhuhai, all in closed 20:45;
    澳门交通管理局宣布,连接半岛的嘉乐庇大桥、友谊大桥、西湾大桥及连接珠海的莲花大桥都于20时45分封闭;
    4. Macao Traffic Management Bureau announced that connect the peninsula Ka Lok Bailey Bridge, Friendship Bridge, West Bay Bridge and the Lotus Bridge linking Zhuhai, all in closed 20:45;
    澳门交通管理局宣布,连接半岛的嘉乐庇大桥、友谊大桥、西湾大桥及连接珠海的莲花大桥都于20时45分封闭;
    5. The bridge cables are main loading structure members of modern large-scale bridges, such as suspended-cable bridge, diagonal bridge and arch suspended bridge.
    桥梁缆索是现代大跨度桥梁——悬索桥、斜拉桥和拱吊桥的主要承重结构,为了保证桥梁和缆索结构的安全,必须强化桥梁缆索锚固系统和防腐保护。

网络释义

    float bridge flying bridge pontoon pontoon bridge raft bridge
    浮桥;
    float bridge flying bridge pontoon pontoon bridge raft bridge
    浮桥;
    float bridge flying bridge pontoon pontoon bridge raft bridge
    浮桥;
    float bridge flying bridge pontoon pontoon bridge raft bridge
    浮桥;
    electrical bibeam bridge crane electric double-beam bridge crane electric two-beam bridge crane
    电动双梁桥式起重机;

查词历史

Copyright @ 2005-2013 可可英语 京ICP备11028623号